Mostrar el registro sencillo del documento

dc.rights.licenseAtribución-NoComercial 4.0 Internacional
dc.contributor.authorGuohui, Li
dc.contributor.authorXiaocheng, Ma
dc.contributor.authorChunling, Yang
dc.date.accessioned2019-07-02T21:58:52Z
dc.date.available2019-07-02T21:58:52Z
dc.date.issued2016-01-01
dc.identifier.issnISSN: 2339-3459
dc.identifier.urihttps://repositorio.unal.edu.co/handle/unal/63637
dc.description.abstractThe Yangtze River Crossing Project, which is part of the Chinese gas pipeline trunk network and aims to transmit the natural gas to the Yangtze River Delta area, sets up a record for the length of Horizontal Directional Drilling (HDD) in the world. The term of pipeline installed is 3300m, and the diameter is 40in. Many technical difficulties have been inevitably encountered in a large diameter hole reaming in fine sand, the calculation of section scour depth which determines the minimum buried depth of the pipe, protection of outside coating and the method of long distance pilot hole drilling, such other challenges. In view of this, it was recommended that two pipelines of 711mm should be installed to replace the existing one of 1016mm in diameter and 1% flooding scour depth obtained by reliable statistical analysis. In period of installation, application glass fiber reinforced epoxy resin as a protective coating, executing the pilot hole by Intersect Method. As a result, this super project is finished successfully on May 21.2013. The experience can be applied to any pipeline engineering the installed by horizontal directional drilling or similar works.
dc.format.mimetypeapplication/pdf
dc.language.isospa
dc.publisherUniversidad Nacional de Colombia - Sede Bogotá - Facultad de Ciencias - Departamento de Geociencia
dc.relationhttps://revistas.unal.edu.co/index.php/esrj/article/view/54504
dc.relation.ispartofUniversidad Nacional de Colombia Revistas electrónicas UN Earth Sciences Research Journal
dc.relation.ispartofEarth Sciences Research Journal
dc.rightsDerechos reservados - Universidad Nacional de Colombia
dc.rights.urihttp://creativecommons.org/licenses/by-nc/4.0/
dc.subject.ddc55 Ciencias de la tierra / Earth sciences and geology
dc.titleEngineering Innovation of a Length of Nearly 3300m large Diameter Pipeline Installed by HDD
dc.typeArtículo de revista
dc.type.driverinfo:eu-repo/semantics/article
dc.type.versioninfo:eu-repo/semantics/publishedVersion
dc.identifier.eprintshttp://bdigital.unal.edu.co/64083/
dc.relation.referencesGuohui, Li and Xiaocheng, Ma and Chunling, Yang (2016) Engineering Innovation of a Length of Nearly 3300m large Diameter Pipeline Installed by HDD. Earth Sciences Research Journal, 20 (1). P1-P5. ISSN 2339-3459
dc.rights.accessrightsinfo:eu-repo/semantics/openAccess
dc.subject.proposalEngineering Innovation
dc.subject.proposalLong distance
dc.subject.proposalLarge diameter
dc.subject.proposalGas Pipeline
dc.subject.proposalHorizontal Directional Drilling (HDD)
dc.subject.proposalStarting Velocity.
dc.type.coarhttp://purl.org/coar/resource_type/c_6501
dc.type.coarversionhttp://purl.org/coar/version/c_970fb48d4fbd8a85
dc.type.contentText
dc.type.redcolhttp://purl.org/redcol/resource_type/ART
oaire.accessrightshttp://purl.org/coar/access_right/c_abf2


Archivos en el documento

Thumbnail

Este documento aparece en la(s) siguiente(s) colección(ones)

Mostrar el registro sencillo del documento

Atribución-NoComercial 4.0 InternacionalEsta obra está bajo licencia internacional Creative Commons Reconocimiento-NoComercial 4.0.Este documento ha sido depositado por parte de el(los) autor(es) bajo la siguiente constancia de depósito