Evaluación de la necesidad del pago de una remuneración a los nuevos proyectos de generación para garantizar su cierre financiero

dc.contributor.advisorFranco Cardona, Carlos Jaimespa
dc.contributor.authorSalas Gaviria, Diego Fernandospa
dc.contributor.researchgroupGrupo de Sistemas Energéticosspa
dc.date.accessioned2020-03-10T16:41:44Zspa
dc.date.available2020-03-10T16:41:44Zspa
dc.date.issued2019-08-31spa
dc.description.abstractIt is the governments obligation to develop the necessary mechanisms to guarantee trust and the continues use of the electrical energy, even in the most extreme conditions. In countries like Colombia, with an energy mix primarily hydroelectric, whom constant exposure to natural occurring weather phenomenon such as El Niño, that increase the summer temperatures and decrease the capacity to generate electricity due to reduced water resources, its necessary to stimulate investment in new centrales that generate trust in the system, mainly in these drought periods. The adopted mechanism in Colombia, to ensure the correct and continuous functioning of the system, is a periodic payment to the generators that dispose themselves to offer energy service of necessary and sufficient to guarantee the trust in the system, called Reliability Charge “Cargo por Confiabilidad”, but nevertheless, this trust isn’t free and must be paid by all the users of the system. The mechanism consists of the auction of Firm Energy Obligation (OEF – Obligaciones de Energía en Firme), within the proprietary agents or those who represent commercial plants an/or units of generation to whom have been assigned the firm energy to the Reliability Charge classified in plants and/or new generating units or special plants and/or existing generating units. With this work, the aim is to establish the need to pay to achieve the financial closure of the new generating projects, by financial valuation of the generating projects, one thermic and one hydraulic, during a 20 year time period, from the projected income by sale of energy in the electric energy stock and valuation of Internal Rate of Return of the projects, with or without income, generated by the payment for the Reliability Charge.spa
dc.description.abstractEs obligación del Estado desarrollar los mecanismos necesarios para garantizar la confiabilidad en la prestación continua del servicio de energía eléctrica, inclusive en las condiciones más extremas. En países como Colombia, con matrices energéticas principalmente hidráulicas, expuestos a la ocurrencia de fenómenos climáticos como El Niño, que agudizan las temporadas de verano y disminuyen la capacidad de generar energía a partir de los recursos hídricos, es necesario crear estímulos para la inversión en nuevas centrales que le garanticen la confiabilidad al Sistema, principalmente durante estos periodos. El mecanismo adoptado en Colombia para asegurar el correcto y continuo funcionamiento del sistema, es el pago de un cargo periódico a los generadores que se disponen a prestar el servicio de energía necesaria y suficiente para garantizar la confiabilidad del sistema, denominado Cargo por Confiabilidad, sin embargo esta confiabilidad no es gratuita y es pagada por todos los usuarios del Sistema. El mecanismo consiste en la subasta de Obligaciones de Energía en Firma, entre los agentes propietarios o que representen comercialmente plantas y/o unidades de generación a las cuales se les haya determinado la Energía Firme para el Cargo por Confiabilidad, (Artículo 20, Resolución CREG 071 del 2006), clasificados en plantas y/o unidades de generación nuevas o especiales y plantas y/o unidades de generación existentes. Con este Trabajo Final de Maestría se busca establecer la necesidad de este pago para lograr el cierre financiero de los nuevos proyectos de generación, mediante la valoración financiera de dos proyectos de generación, uno térmico y otro hidráulico, a partir de la proyección de los ingresos por venta de energía en la bolsa de energía eléctrica y la valoración de las Tasas Internas de Retorno de los Proyectos, con y sin ingresos, provenientes del pago por cargo por confiabilidad.spa
dc.description.additionalMagister en Ingeniería – Sistemas Energéticosspa
dc.description.degreelevelMaestríaspa
dc.format.extent68spa
dc.format.mimetypeapplication/pdfspa
dc.identifier.urihttps://repositorio.unal.edu.co/handle/unal/76044
dc.language.isospaspa
dc.publisher.branchUniversidad Nacional de Colombia - Sede Medellínspa
dc.relation.referencesACOLGEN. (2018). Análisis de la Evolución del Cargo por Confiabilidad.spa
dc.relation.referencesBotero Duque, J. P. (2016). Efectos del cargo por confiabilidad sobre el precio spot de la energía eléctrica en Colombia.spa
dc.relation.referencesCongreso de la República de Colombia. (1994). Ley 142. Ley 142.spa
dc.relation.referencesCongreso de la República de Colombia. (1994). Ley 143.spa
dc.relation.referencesConstituyente, A. N. (1991). Constitución Nacional de Colombia.spa
dc.relation.referencesContraloría General de la República. (2016). Manejo de recursos del Cargo por Confiabilidad. Bogotá.spa
dc.relation.referencesCramton, P., & Stoft, S. (2007). Colombia Firm Energy Market.spa
dc.relation.referencesCramton, P., Stoft, S., & West, J. (2006). Simulation of Colombian Firm Market.spa
dc.relation.referencesCREG. (1995). Resolución 24.spa
dc.relation.referencesCREG. (1995). Resolución 73.spa
dc.relation.referencesCREG. (1996). Resolución 001.spa
dc.relation.referencesCREG. (1996). Resolución 116.spa
dc.relation.referencesCREG. (2006). Resolución 071.spa
dc.relation.referencesCREG. (2009). Reolución 51.spa
dc.relation.referencesCREG. (2010). Resolución 11.spa
dc.relation.referencesCREG. (2010). Resolución 73.spa
dc.relation.referencesCREG. (2015). Resolución 177.spa
dc.relation.referencesCREG. (2017). Resolución 140.spa
dc.relation.referencesCREG. (2019). Resolución 29.spa
dc.relation.referencesEFRONTIER ECONOMICS, Un Informe para el Banco Interamericano de Desarrollo. (2017). Revisión institucional delspa
dc.relation.referencesGarcía S., O. L. (2009). Administración Financiera. Fundamentos y Aplicaciones. Calí: Prensa Moderna Impresores S. A.spa
dc.relation.referencesGarcía, O. L. (2003). Valoración de Empresas Gerencia del Valor y EVA. Cali: Prensa Moderna Impresores S. A.spa
dc.relation.referencesOspina Riaño, A. D., & Mosquera Palacios, D. (2016). Cargo por Confiabilidad ¿éxito o fracado? Revista de Derecho y Economía, 13-36.spa
dc.relation.referencesRevista Semana. (1992). ¿De quienes la culpa?spa
dc.relation.referencesU.S. Energy Information Administration. (2019). Annual Energy Outlook.spa
dc.relation.referencesUPME. (2018). Plan de Expansión de Referenica Generación Transmisión 2017-2031.spa
dc.relation.referencesXM. (2006). Informe Anuale de Operación y del Mercado .spa
dc.relation.referencesXM. (2007). Informe Anual de Operación y de Mercado.spa
dc.relation.referencesXM. (2008). Informe Anual de Operación y de Mercado.spa
dc.relation.referencesXM. (2009). Informe Anual de Operación y de Mercado.spa
dc.relation.referencesXM. (2010). Informe Anual de Operación y de Mercado.spa
dc.relation.referencesXM. (2011). Informe Anual de Operación y de Mercado.spa
dc.relation.referencesXM. (2012). Informe Anual de Operación y de Mercado.spa
dc.relation.referencesXM. (2013). Informe Anual de Operación y de Mercado.spa
dc.relation.referencesXM. (2014). Informe Anual de Operación y de Mercado.spa
dc.relation.referencesXM. (2015). Informe Anual de Operación y de Mercado.spa
dc.relation.referencesXM. (2016). Informe Anual de Operación y de Mercado.spa
dc.relation.referencesXM. (2017). Informe Anual de Operación y de Mercado.spa
dc.relation.referencesXM. (2018). Informe Anual de Operación y de Mercado.spa
dc.relation.referencesXM. (2019). Obtenido de http://www.xm.com.co/Paginas/Mercado-de-energia/asignacion-subastas.aspxspa
dc.relation.referencesXM. (2019). Obtenido de https://www.xm.com.co/Paginas/Mercado-de-energia/obligacion-de-energia-firme.aspxspa
dc.relation.referencesXM. (08 de 2019). XM. Obtenido de https://www.xm.com.co/Paginas/Generacion/despacho.aspxspa
dc.rightsDerechos reservados - Universidad Nacional de Colombiaspa
dc.rights.accessrightsinfo:eu-repo/semantics/openAccessspa
dc.rights.licenseAtribución-NoComercial 4.0 Internacionalspa
dc.rights.spaAcceso abiertospa
dc.rights.urihttp://creativecommons.org/licenses/by-nc/4.0/spa
dc.subject.ddc330 - Economía::333 - Economía de la tierra y de la energíaspa
dc.subject.proposalCargo por confiabilidadspa
dc.subject.proposalHydraulic generationeng
dc.subject.proposalGeneración térmicaspa
dc.subject.proposalValoración financiera de proyectosspa
dc.titleEvaluación de la necesidad del pago de una remuneración a los nuevos proyectos de generación para garantizar su cierre financierospa
dc.typeDocumento de trabajospa
dc.type.coarhttp://purl.org/coar/resource_type/c_8042spa
dc.type.coarversionhttp://purl.org/coar/version/c_ab4af688f83e57aaspa
dc.type.contentTextspa
dc.type.driverinfo:eu-repo/semantics/workingPaperspa
dc.type.redcolhttp://purl.org/redcol/resource_type/WPspa
dc.type.versioninfo:eu-repo/semantics/acceptedVersionspa
oaire.accessrightshttp://purl.org/coar/access_right/c_abf2spa

Archivos

Bloque original

Mostrando 1 - 1 de 1
Cargando...
Miniatura
Nombre:
71317277.2019.pdf.pdf
Tamaño:
2.04 MB
Formato:
Adobe Portable Document Format
Descripción:
tesis de Maestría en Ingeniería - Sistemas Energéticos

Bloque de licencias

Mostrando 1 - 1 de 1
Cargando...
Miniatura
Nombre:
license.txt
Tamaño:
3.9 KB
Formato:
Item-specific license agreed upon to submission
Descripción: