Production scheduling with sequence-dependent setups and job release times

Cargando...
Miniatura

Autores

Montoya Torres, Jairo Rafael
Soto Ferrari, Milton Rene
González Solano, Fernando

Director

Tipo de contenido

Artículo de revista

Idioma del documento

Español

Fecha de publicación

2010

Título de la revista

ISSN de la revista

Título del volumen

Documentos PDF

Resumen

This paper studies a shortterm production scheduling problem inspired from reallife manufacturing systems consisting on the scheduling a set of jobs (production orders) on both a single machine and identical parallel machines with the objective of minimizing the makespan or maximum completion time of all jobs. Jobs are subject to release dates and there are sequence-dependent machine setup times. Since this problem is known to be strongly NP-hard even for the single machine case, this paper proposes a heuristic algorithm to solve it. The algorithm uses a strategy of random generation of various execution sequences, and then selects the best of such schedules. Experiments are performed using random-generated data and show that the heuristic performs very well compared against the optimal solution and lower bounds, and requiring short computational time.

Abstract

Descripción Física/Lógica/Digital

Palabras clave

Citación

Colecciones